XTE – Consultants, Designers, Architects, Engineers, Project Managers & Operators
This 48,000-square-foot facility is designed to house three new fluidized bed incinerators and their associated equipment. The process equipment includes polymer systems, dewatering centrifuges, cake storage bins, and the necessary pumping and piping for cake storage. The project also involves the installation of owner-procured incineration equipment, a turbine generator, and a water treatment system.
Additionally, this LEED Gold-certified project includes the reworking and addition of new pumping systems within the sludge storage tank area, as well as the construction of a new biofilter odor control system, enhancing the facility’s environmental management capabilities.